Build-vs-Lease ROI Studio (IRU/Dark vs Lit Waves)

Compare NPV, Levelized Monthly Cost (LMC), total nominal cost, and savings IRR/payback vs lit baseline. Monthly discounting.

Monthly r = (1+annual)1/12−1
Units
Build & Own (Construct + Operate)
km
Make-ready, entrances, permits
Spreads CAPEX across this period
Credited as +cashflow in final month
Unlevered analysis. CAPEX is phased; O&M accrues monthly.
IRU / Dark Lease
km
Paid at month 0
Must be ≤ analysis term
IRU modeled as upfront fee + annual O&M. O&M ends after IRU term.
Lit Waves (Baseline)
Applied each 12 months
Multiplies MRC/NRC
Lit is the baseline for savings/IRR/payback.
Results (monthly discounting)
—
Build & Own
NPV of costs
—
Levelized Monthly Cost
—
Total nominal cost
—
Savings IRR vs Lit
—
Payback vs Lit
—
IRU / Dark
NPV of costs
—
Levelized Monthly Cost
—
Total nominal cost
—
Savings IRR vs Lit
—
Payback vs Lit
—
Lit Waves (Baseline)
NPV of costs
—
Levelized Monthly Cost
—
Total nominal cost
—
Escalator (annual)
—
Waves counted
—
Shareable summary
Assumptions & methodology
  • Monthly discounting: rm = (1+ra)1/12−1. NPV = Σ CFt / (1+rm)t.
  • Levelized Monthly Cost: LMC = NPV × CRF, where CRF = rm(1+rm)N/((1+rm)N−1).
  • Savings series = CostLit − CostOption; IRR/Payback computed on this series.
  • Build CAPEX is phased; residuals credit a positive terminal cashflow.