Route Latency & Path-Inflation Checker
Best-case physics vs. real-world latency. Uses ~4.9 μs/km in single-mode fiber (n≈1.468), plus overheads you control.
If you only have straight-line distance, add path inflation below.
0%15%50%
Real routes exceed straight-line due to rights-of-way, bends, and entrance diversity.
Typical SMF: n ≈ 1.467–1.468 at 1310–1550 nm. Lower n → faster propagation.
Estimate serialization delay (optional)
Serialization (one-way): —
Set the tolerance around your SLA where results show NEAR (edge of compliance).
Quick presets
One-way (best-case, propagation only)
—
RTT (best-case)
—
One-way (real-world est.)
—
RTT (real-world est.)
—
SLA: —
Note: “Best-case” excludes device/serialization delays. “Real-world” includes your overhead settings.
Route details
Effective distance
—
Effective distance (mi)
—
Vacuum lower bound
3.3356 μs/km
Fiber constant
—
Propagation (one-way)
—
Overheads (one-way)
—
Shareable summary
Assumptions: one-way propagation time in fiber ≈ 4.9 μs/km (n≈1.468). Vacuum lower bound is 3.3356 μs/km. Real-world adds path inflation and device/serialization/queuing allowances. Estimates are for planning.