Ring Planner & Diversity Visualizer

Add 2–6 sites. Optionally include lat/lon to auto-compute segment distances; otherwise use the manual editor or a default hop. The tool sketches a ring, estimates one-way & RTT latency, checks entrance diversity per site, and builds an RFQ summary.

Sites

Tip: For lat/lon, right-click a spot in Google Maps and copy the coordinate pair.

Options

Latency model
Factor (ms/km)
Using auto distances

Manual Segment Distances

Override per-segment km between adjacent ring sites. Leave blank to use Haversine or default hop. Effective km = distance × (1 + slack%).

Sketch


    

Segment Metrics

Total fiber (km): 0.0
Total RTT around ring (ms): 0.000

Diversity Checklist

Waiting for inputs…

Primary vs. Diverse Paths from POP/DC

RFQ Summary

Copy into an email or form. The “Get 3 quotes” link opens a mail draft with the summary.

Get 3 quotes (email)