Downtime Risk & SLA Cost Calculator
What is unreliable internet really costing you, and what’s the value of fiber plus diversity?
Real-time math
SLA credits
Redundancy modeling
Payback months
Inputs
Status Quo
Presets: Coax 4 outages × 6 hours. 5G fixed 6 × 4. Single DIA 2 × 3. Edit as needed.
Architectures To Compare
Single DIA fiber
DIA + failover (5G or broadband)
Dual diverse DIA (independent routes/providers)
Dark + lit path (independent pair)
Results
Recommended option
—
Status quo loss (net of SLA)
$0
Best payback vs status quo
—
Tip: if dual diverse shows extremely low downtime, verify the two paths are truly independent with separate entrances and upstreams.
Architecture Comparison
| Architecture | Downtime h/yr | Degraded h/yr | Annual loss $ | SLA credits $ | Total annual cost $ | Meets target? | Payback vs SQ |
|---|