Fiber RFP Template: 30 Questions Vendors Must Answer with Route Photos and Distances

Fiber RFP Template: 30 Questions Vendors Must Answer with Route Photos and Distances

If you want real redundancy, you need proof you can hold in your hand. Maps are marketing. Photos, distances, and test files are evidence. Use the template below to force apples-to-apples answers from every fiber vendor so you can compare routes, MTTR, and total risk without guesswork.

Executive snapshot

Ask for photos and distances, not just a line on a map. The template below groups 30 vendor questions and builds a copyable RFP draft. A quick calculator shows when fixing false diversity pays for itself.

Proof
Entrance photos, first handholes, crossings
Distance
Meters and kilometers between key points
Acceptance
OTDR, light levels, failover tests
1️⃣ Route proof deliverables vendors must attach
ItemWhat to attachPurpose
Curb entrancesStreet-level photos with GPS and time stampVerify different entrances on different block faces
First handholesPhotos of lids and interiors plus IDsConfirm separation at the first vault
CrossingsPhoto set for each bridge, rail, river, or highwayCatch common choke points
Building handoffMMR or closet photos and room numbersRemove single-room points of failure
DistancesTable of meters between entrance, vault, crossing, and MMRQuantify overlap and shared segments
If any segment uses a third party, require the same photos and distances for that segment.
2️⃣ The RFP questions
Check the items you want in your draft, then build and copy at the bottom. All questions expect photo evidence and distances where noted.
A) Route and diversity
B) Physical plant and construction
C) Cloud on ramps and interconnection
D) SLA, MTTR, and maintenance
E) Testing and turn up
F) Commercial and change
3️⃣ Build your RFP text
The draft includes a short preamble plus the checked questions. You can still edit inside the box.
Tip: paste into your RFQ email or procurement portal. Keep numbering so vendors reply in line.
4️⃣ Distance table template vendors must fill
PathSegmentFromToDistance (m)Notes
PrimaryEntrance to first handhole123 Main St curbHH-17A—Photo attached
PrimaryFirst handhole to bridge crossingHH-17ABridge X—Photo attached
BackupEntrance to first handhole456 Oak Ave curbHH-9C—Photo attached
BackupShared segment disclosure———Give exact meters and location
5️⃣ Vendor response matrix
ItemVendor AVendor BVendor C
Different curb entrancesYes / NoYes / NoYes / No
Different first handholesYes / NoYes / NoYes / No
No common crossingsYes / NoYes / NoYes / No
Photo set completeYes / NoYes / NoYes / No
OTDR and light levelsIncludedIncludedIncluded
Automatic SLA creditsYes / NoYes / NoYes / No
6️⃣ Cost of false diversity
Estimate yearly impact when both circuits fail together. Compare to the cost of a true second entrance or private path.
Outage impact quick math
Annual outage impact
$0
Annualized fix cost
$0
Simple decision view
—
Annualized fix assumes a simple 3 year amortization plus monthly cost.
7️⃣ Acceptance checklist
Turn up items to file
  • Entrance and first handhole photos
  • Crossing list with coordinates
  • OTDR traces and light levels
  • As-built route with distances
Operational items to confirm
  • Escalation contacts tested
  • Maintenance windows documented
  • Failover test completed
  • SLA credit automation verified

This RFP format turns vague promises into verifiable facts. Ask for photos, distances, and test files up front, compare vendors with the response matrix, and use the calculator to price the risk of shared routes. If a provider cannot supply evidence for an item, keep it out of the contract or choose a route you can prove.